Case Study

Electrospeed Advantage VSD Overcame ESP Gas Lock in Egypt

Electrospeed Advantage VSD Overcame ESP Gas Lock in Egypt

Pages 1 Pages

Case History An operator in Egypt had a standard electrical submersible pumping (ESP) system installed in a well with high gas/ oil ratio (GOR). The ? uid characteristics and the lack of downhole gas-handling technology caused frequent gas-lock conditions in the pump along with undesired consequences to the ESP such as: increased motor temperature, unstable pump operation, erratic motor load, and frequent system tripping. The operator ap

Join for free to read