Case Study
Electrical Power Quality Survey
Case study Electrical power quality survey THE CHALLENGE Our client was planning to replace their existing on-site generation, by installing a Biomass Combined Heat and Power Plant (CHP) capable of generating 50MW of electrical power; part of which would be consumed by the plant with remainder exported to the National Grid. Before doing so, our client needed to obtain a baseline of the existing (pre-CHP plant) power quality at the point