Case Study

Electrical Improvements

Electrical Improvements

Electrical Improvements » Donohue & Associates, Inc. Client: Illinois American Water Company Location: Peoria, Illinois Donohue provided planning and designed improvements to increase the effective capacity and improved reliability at their Main Station Water Treatment Plant. The $6.8M project included the installation of a previously removed vertical turbine high service pump, replacement of the electrical distribution system and flood protection for the equipment due to the plants location next to the Illinois River. The plant previously used 2.4 kV for site distribution and high service pump motor utilization. The system was upgraded to distribute 13.2 kV throughout the plant in a looped configuration using aerial reclosers and bare conductors supported by poles and cross arms. The recl

Join for free to read