Electric Power Plant Reduces Fouling in Heat Exchanger and Condenser

Electric Power Plant Reduces Fouling in Heat Exchanger and Condenser

Pages 2 Pages

System identification: Hydrogen cooler and main condenser for recirculating cooling water Solids/Liquid: Debris, sediment and corrosion by-products in brackish, aggressively corrosive cooling water Problem: Due to heavy sludge fouling, the shell and tube heat exchanger of the hydrogen cooler at a major east coast power plant had to be removed from service to be mechanically cleaned every six to eight weeks. This typically resulted in two days of