Case Study

El-Nozha

El-Nozha

Pages 2 Pages

Turnkey realization of a GIS 66/11kV substation in Nasr City – Cairo, Egypt, with an extremely short delivery time (10 months). The substation located inside new Golden Pyramid resort, was designed for the resort as well as for the El- Nozha neighborhood. Following the successful association of GE-HITACHI HVB and MATELEC in the BCD project, this was the first project jointly executed in Egypt. Back to back, MATELEC had the complete responsibility

Join for free to read