Case Study

Eisenhower Tunnel, Colorado DOT Project

Eisenhower Tunnel, Colorado DOT Project

Pages 1 Pages

US SPEC Products: MP Grout, FS Grout Contractor: MWH Constructors Engineering Group: Carollo Engineers Date of Completion: May 2014 112 South Santa Fe Drive Denver, CO 80223 US SPEC PRODUCTS PHONE: 303.778.7227 FAX: 303.722.8426 www.usspec.com Eisenhower Tunnel Colorado DOT Project PROJECT PROFILE Completed in 1975, the Eisenhower Memorial Tunnel is located approximately sixty miles west of Denver, Colorado. It

Join for free to read