Case Study

Eiffage Energie - Draco tera KVM switches help in the maintenance of the LGV high-speed rail link

Eiffage Energie - Draco tera KVM switches help in the maintenance of the LGV high-speed rail link

Pages 2 Pages

CASE STUDY The Customer Eiffage was chosen in 2011 by SNCF Réseau for the financing, design, construction and maintenance of the 3 billion Euro high-speed line linking Le Mans with Rennes; one of the largest rail projects funded by the European Commission and due for completion in May 2017. This project adds a new high-speed train line of over 182 km to the existing line between Paris and Le Mans, putting Rennes within 1.5 hours travelling time of Paris. The Challenge A major new control room was needed to enable train operators to manage and ensure total safety and reliability of the new line. As with all modern transportation systems, safety is a critical element, so the control room has to be operational at all times. The Solution System integrator, Elecdan, was selected to e