Case Study

EcoWave Technology Prevented Scale Buildup

EcoWave Technology Prevented Scale Buildup

Pages 1 Pages

Case History Flowline blockage Wells in the Bone Spring formation, New Mexico, produce oil, water, and a small amount of gas. In one well, scale in the water caused blockages that required ? owlines to be replaced. The operator implemented a remediation program that consisted of continuous injection of a scale inhibitor down the annulus. The chemical treatment did not prevent the ? owline blockage. To solve the operator’s problem, Baker

Join for free to read