Case Study

EC Prime enhanced conductivity fracturing service doubled production in low-permeability well

EC Prime enhanced conductivity fracturing service doubled production in low-permeability well

Pages 2 Pages

EC Prime enhanced conductivity fracturing service doubled production in low-permeability well Challenges • Increase production from low-permeability formation • Customize fracturing treatment to the formation Results • Doubled production rates compared to conventional fracturing • Created $270,000 USD additional revenue over 2 months • Created high-conductivity fractures The background An operator working onshore Indonesia needed a fracturing solution for its new wells. Having used a conventional fracturing approach in the past, the operator had achieved mediocre gains in production, with most wells in the area producing an average of 60 barrels of oil per day (BOPD). Part of the challenge was that the sandstone formation had relatively low pe

Join for free to read