Case Study

East Kameleon Marathon Oil Norge AS

East Kameleon Marathon Oil Norge AS

Pages 2 Pages

Alvheim,Vilje&VolundFieldDevelopments Overall Field Layout Status as of 07.02.11 Alvheim FPSO East Kameleon Vilje Kneler B KnelerA Boa Volund WDW East Riser Base Choke & Metering Skid Vilje 12” Production Pipeline - 19,0 km SAGE 14” Gas Export Pipeline - 36.31km to tie-in Vilje 6” Gas Lift Pipeline - 21,1 km Vilje Umbilical - 19,3 km South Riser Base 12.3” ID Flexible Water Injection Pipeline - 12.6 km Control Umbilical (from East Riser Base) - 1

Join for free to read