Case Study

East Croydon Station Footbridge

East Croydon Station Footbridge

Pages 1 Pages

www.severeld.com East Croydon Station Footbridge Location: East Croydon, London Client: Network Rail Main Contractor: BAM Nuttall Ltd Engineer: Mott McDonald Architect: Network Rail Tonnage: 793 Completion Date: 05/14/2013 Project Overview: The footbridge is a replacement for the underground walkways and is to connect the existing three platforms and potentially a fourth platform island. The purpose of the bridge is to reduce congestion during r

Join for free to read