Case Study
Ease of Installation at College Makes Everyone a Winner - Especially the Customer
PROJECT: College, condenser water and cooling tower retrofit PRODUCTS: aquatherm blue pipe® LOCATION/DATE: New Jersey Spring 2018 AQUATHERM ADVANTAGES: • The lighter weight, ability to easily fabricate assemblies and ability to make pipe connections “in the air” presented considerable labor and cost savings over steel pipe • The mechanical contractor offered the owner a corrosion- proof piping system with an anticipated service life of 60- plus years, with low operating and maintenance costs • Aquatherm PP-R piping systems require no open-flame welding or solder, so no fire watch was required and work proceeded while the buildings were occupied T he aging chiller/boiler physical plant at a New Jersey community college had received some upgrades in recent years, but it