Case Study

Earth Wall Testing

Earth Wall Testing

An overview of the pipe at the earth penetration Corrosion patch detected at the entrance location. • 14” light crude line • Painted pipe surface • Bitumen coating within the buried section • Wall section is 2.3m wide Job Details • Soil/air interface and buried section inspected • Medium (Category 2) corrosion identified at the entrance location • Defect axial position and circumferential orientation highlighted for follow up and repair

Join for free to read