Case Study
E & S Pork, INC
Case Study www.pitcharger.com info@pitcharger.com ? 888-231-1002 FACILITIES Four pull plug, 1,000 head pull plug units with tunnel ventilation. Each pit has pull plugs at both ends. Slurry is drained into a 1.8-million gallon cement basin. PRE-PITCHARGER ENVIRONMENT Manure solids had built up to the point that one-third to one-half of the length of the pits were plugged. Draining could only occur at one end of the buildin