Case Study

Dynapac achieved improved material flow, cost savings and efficient use of warehouse and production space.

Dynapac achieved improved material flow, cost savings and efficient use of warehouse and production space.

Pages 2 Pages

Daniel Rasmusson Project Logistic De- veloper and Maria Gummesson Logistic Developer at Dynapac AB summarise the improvement and the conversion to Lean Production as a extremely rapid and chal- lenging experience, but with a very successful result. – Everyone is affected by changes and it feels good that we’re all satisfied. The personnel like the structure and we will use the same set-up with trucks and kitted trol- leys for future

Join for free to read