Case Study
Dynamic Exploration Graugnard
September 13, 2002 Re: Dynamic Exploration Graugnard #1 Well Lost ciruculation remedy with Blockade LCM Squeeze This overview outlines the progression of events following our being called to resolve the lost circulation problems on the above-referenced well. During the course of our involvement from September 7 – 13, 2002, two Drillchem engineers worked on a 24 hour basis with the Dynamic Exploration drilling foremen, Ambar