Dutypoint Ltd, Shepherd Road, Gloucester GL2 5EL T: 01452 300592 | sales@dutypoint.com www.dutypoint.com PROJECT NAME Abbey Road INDUSTRY SECTOR Construction PROJECT TYPE Residential Tower Block CLIENT Manhire Associates PROGRAMME 3 Days COMPLETION Summer, 2017 PRODUCT SUPPLIED 2 x Vortec Packaged Pump Stations PROJECT SUMMARY As part of major re-development program of London’s famous Abbey Road, Manhire Associates required a waste water solution to be installed with minimal disruption or impact on the iconic crossing. PROJECT CHALLENGE Dutypoint were brought into this project at a late stage by a main contractor. The build program was well under way and progressing quickly. The structural design was complete based on a 1000mm pump chamber but pump flow rates were still in que