Dunkirk LNG project
Dunkirk LNG project Dunkirk LNG project Project description: • Development of a regasification plant in the port of Dunkirk, in northern France. •Commissioned by SENER. Customer challenges: • Fire performance. •Short lead-time for Low Voltage package. •Meet end-user technical specifications. Nexans’ solutions: •1,300 km of low-voltage and medium voltage power cables armoured with steel tape. •Expertise in fire performance cables with capability to test in factory (Fire test NF C 32070 CR1). •General know-how for French specs cables and long experience on the LNG Terminals.