Case Study

DSV is picking at the right pace with IBS

DSV is picking at the right pace with IBS

Company background The Volvo plant produces more than 1,000 cars per day, 24/24 hours and five days per week. Volvo operates with a time on task of 74 seconds (the time that is needed to repeat the same activity on the assembly line). The growing complexity as a result of the expansion of the number of variants was the reason for Volvo to seek a strong lo- gistics partner. To give an idea: an average of only one and the same Volvo is built e

Join for free to read