Case Study
DSV is picking at the right pace with IBS
Company background The Volvo plant produces more than 1,000 cars per day, 24/24 hours and five days per week. Volvo operates with a time on task of 74 seconds (the time that is needed to repeat the same activity on the assembly line). The growing complexity as a result of the expansion of the number of variants was the reason for Volvo to seek a strong lo- gistics partner. To give an idea: an average of only one and the same Volvo is built e