Case Study

Dry Creek Wetlands

Dry Creek Wetlands

Project: Dry Creek Wetlands Date: 1996 Client: City of Tea Tree Gully Location: SA ELCOSEAL ® The City of Tea Tree Gully in Adelaide, South Australia needed to construct a lake system that could take excess flows from the main stormwater channel during periods of heavy rain. In all, three medium size ponds totalling 3700 m 2 were constructed. These lakes were constructed over an e

Join for free to read