Case Study
Driving Cost Savings ‘From The Ground Up’ For Barratt Homes
Case Study B arratt Homes has benefitted from both time and cost savings at ‘The Elms’, a new build development in Stockton on Tees, after replacing a traditional raft foundation structure with Insulslab– the fully integrated and super insulated foundation system. Delivering the foundation up to ground floor level, Insulslab has been used to construct a mixture of 18 detached and 2 semi-detached homes on the site to date, with a further