Case Study
DRILLING WITH A SIXTH GENERATION SEMI-SUB IN SHALLOW WATER
THE PROJECT The client became concerned about the implication of the campaign on the fatigue life of the wells, as the pre-drilling analysis had predicted a poor fatigue response. The client engaged Pulse to provide a monitoring system which would enable the operations team to manage the well fatigue life during the drilling. THE RESULT ? DrillASSURETM software measured strain to provide real-time evaluation of fatigue life remaining in conductor ? Drilling team can track conductor fatigue life usage through the drilling campaign and ensure that the operation is kept within the defined parameters ? Online measurement and evaluation of data. DRILLING WITH A SIXTH GENERATION SEMI-SUB IN SHALLOW WATER www.acteon.com An operator was planning a drilling campaign in the Norwegian Nort