Case Study

Drill Clean

Drill Clean

Pages 1 Pages

Client Case Study: Deep Water DrillClean Saves Customer $150,000 of Non-Productive Time (NPT) and a Stuck Pipe Event during Deep Water Operations Mitigating stuck pipe events in o?shore highly deviated well. The operator was drilling a highly deviated well with the expectation that hole cleaning would be a challenge. In order to prevent any serious non-productive time through poor hole cleaning, an e?ective quantitative cuttings monitoring se

Join for free to read