Driftwood Equalization Basin

Driftwood Equalization Basin

Driftwood Equalization Basin Nashville, Tennessee The 2011 Long Term Control Plan for the Nashville Metro Water Services Combined Sewer System indicated that the capacity of the Driftwood Equalization Basin needed to be expanded from approximately 3.3 million gallons to 6.4 million gallons in order to reduce the number of expected over?ow events in a typical year from approximately six to nearly zero. The original conceptual design by another consultant for the expansion of the Driftwood Equalization Basin involved the addition of several large pumps to convey combined sewage from one compartment into the other. This approach would have required extensive modi?cations to the structure. Operation of the pumps would have also incurred signi?cant electrical expenditures as well as increased o