Case Study

Drax Power Station Process Control Refurbishment (Units 4 to 6)

Drax Power Station Process Control Refurbishment (Units 4 to 6)

Pages 2 Pages

Business challenges Following the first half refit in 1997, the main control room comprised three modern ‘soft’ operator desks based upon the APMS SCADA system, and three ‘hard’ control desks using conventional controls and indications. Operating two types of control desk required different skills and restricted flexibility and efficiency. Given the size of this project, a competitive tender was issued and after an intensive tendering period,

Join for free to read