Downhole Tubing for Polish Copper Mine
Coil-Lock mechanical joint Photo 1 Photo 2 Photo 3 www.fgspipe.com • fgspipe@nov.com This project involves a 14 Inch water disposal line installed vertically in a 1000 meter deep mine shaft. The line replaces an old, heavily corroded steel pipeline used for the disposal of water from the mine. The pipeline was divided into nine (9) sections. Every section was custom made to fit the existing support layout. Between every section, a speciall