Dow Provides Solutions for 2009 World Games Stadium
Dow Provides Solutions for 2009 World Games Stadium Case Study: 2009 Kaohsiung World Games Main Stadium the roof generate more than one million kilowatt-hours of electricity per year, which generates approximately 80% of the stadium’s energy needs. To achieve this success, architects and contractors needed to resolve a series of technical issues from the design to the construction phases. Among the energy-saving features of the stadium is a silicone structural glazed solar panel system which maximizes the solar energy production from each module. In addition, better thermal and weatherproofing performance was designed into the stadium’s roof and facade. Project Description Kaohsiung Stadium, the main venue of the 2009 World Games, welcomed 4,500 athletes from 105 countrie