Dominion Heights Fresno / California Initially, property ownership contracted with an epoxy pipe lining provider, believing a lining solution would save their aging galvanized supply piping system. However, it became clear halfway through the epoxy lining project that this solution would not resolve their leaking pipes. At that point, SageWater was hired to remediate the failed epoxy installation, as well as repipe the remainder of the existing galvanized system (including main lines) with a new Uponor PEX piping solution. In addition, SageWater crews performed drywall and paint repairs to the affected surfaces, returning the building back to its original Knished condition. Copper And Galvi Piping , Supply Piping Units : 196 Stories : 2 Built : 1996 Duration : 3.5 months Problem : Aged gal