Case Study

Dolphin Drilling Fabric Maintenance Services

Dolphin Drilling Fabric Maintenance Services

Pages 2 Pages

Dolphin Drilling Fabric Maintenance Services Case Study: Byford and Borgsten Drilling Rigs Coating Removal and Painting Location: Offshore UKCS Operator: DOLPHIN DRILLING Sureclean were contracted to provide painting crews in support of Fabric Maintainance campaigns scheduled by Dolphin Drilling onboard the Byford and Borgsten drilling rigs whilst on location offshore in the UKCS. Sureclean Scope Provide manpower and equipment for the removal of the tired existing coating using Ultra High Pressure Water Jetting Technology and apply the new coating in compliance with manufacturer’s guidelines. Technical Challenge All works were to be completed with zero discharge, a system of work was engineered encompassing the use of vacuum systems and specialist toolings e.g. hand held aqua-blaster and d

Join for free to read