Case Study
Directional Drilling
VisIsTheFuture.com | 706.880.3402 Milliken ® Infrastructure Vis ™ Divide Segmented HDPE Rigid Conduit Date : December, 2015 End User : The Client Installer : Wiggins Services Venue : Arkansas Case Study Application: Directional Drilling Vis Divde was placed onsite using the directional drilling method. The bore and fiber install took place over a two week span since the ducts needed to be in place before the cable installation. The Vis Div