DINORAIL
MTS DINORAIL CASE STUDY• The original job was scheduled to be completed in three (3) nights but using the Dino Rail put the project ahead of schedule which prompted the client to expand the initial request • Operators were cleared to use the stabilizers and instructed to re-use excavated material as backfill • A selection of equipment was assigned to this project including an MTS DinoRail Suction Excavator (SE), and a support vehicle with Skid Steer and trailer • The initial project plan was to utilize the SE’s Hi-Rail kit to mount the track, safely excavate a test pit, then dismount from the track and dump materials in a location that allowed the Skid Steer to backfill each test pit This particular project required excavation to be done on the tracks in a utility-dense ar