Case Study
DIMMINUTOR® T25 Channel Comminutor Cuts Cost
Case Study: DIMMINUTOR® T25 Channel Comminutor Cuts Cost Fredericton, Canada, a city of 50,000 residents, is the capital of the Canadian Province of New Brunswick. The Wastewater treatment plant, operated by the Fredericton Pollution Control Commission, is a secondary activated sludge system designed to treat an average flow of 5mgd. Septage and incoming wastewater flow through screens which direct oversized objects to the channel grin