Case Study

Digester biogas project under a PPA - 1.4 MW onsite fuel cell power plant from biogas to reduce emissions and reach energy self-sufficiency

Digester biogas project under a PPA - 1.4 MW onsite fuel cell power plant from biogas to reduce emissions and reach energy self-sufficiency

Pages 2 Pages

Installation of a 1.4 MW onsite fuel cell power plant from biogas to reduce emissions and reach energy self-sufficiency Case Study: San Jose Water Pollution Control Plant Digester biogas utilization project under a power purchase agreementEnergy Generation from digester biogas H 2 S Removal An iron oxide gas purification process is used to eliminate corrosive and odour causing H 2 S from the biogas. Reducing sulphur impurities ensures optimal

Join for free to read