Case Study

Diamond Wire Mesh

Diamond Wire Mesh

Pages 1 Pages

DIRECT METALS ® ® Case Study We supplied 186 panels of our intercrimp Diamond Mesh (with 1" U-Edg- ing) in the construction of the new Woodridge Park District Athletic Rec- reation Center in Woodridge, IL -- set to open January 2, 2017. The wire mesh is placed around the perimeter of the rec center’s 2nd floor track as part of the handrail structure. Location: Woodridge Park District Athletic Recreation Center Woodridge, IL Material: 1" open

Join for free to read