Case Study
Dewatering Wastewater Residuals in Existing Drying Bed
Dewatering Wastewater Residuals in Existing Drying Bed February, 2011 Volume 307 Case Study Summary This wastewater treatment plant in Michigan chose a Geotube® system to dewater the wastewater residuals. The Geotube® con- tainer was fabricated to fit in the existing dry- ing beds at the facility. WaterSolve LLC was contracted to provide the equipment, prod- ucts, and training to install the system. This application of Geotube® dewateri