Case Study
Dewatering Source Removal
Dewatering Source Removal Handex installed a well point dewatering system to remove and dispose of approximately 2,200 tons of soil in a secure landfill. The Challenge Orlando Utilities Commission (OUC) in Orlando, Florida, operated a power plant that was decommissioned. As part of the closure project, it was necessary to remove a leaking 10,000 No. 6 Oil Underground Storage Tank. The groundwater table is high in the area. The work area was bound along one side by railroad tracks, and the area of contaminated soil for removal contained a 30-inch water main. The SolutionWe performed a site assessment to determine the aerial extent and depth of contaminated soil. The project required the installation of approximately 150 linear feet of sheet piling to a depth of 25 feet along the railroad tr