Case Study

Dewatering of Biosolids from WWTP Lagoon

Dewatering of Biosolids from WWTP Lagoon

Pages 2 Pages

Dewatering of Biosolids from WWTP Lagoon Your Water, Wastewater, & Materials Dewatering Partner 5031 68th Street SE, Caledonia, MI 49316 | (616) 575-8693 | Fax: (616) 575-9031 Biosolids lagoon during early stage of the project. A 6” submersible pump was suspended on a cable and the material was pumped to the Geotube® contain- ers. Objective A city in Colorado needed to remove biosolids from a WWTP lagoon which was no longer in servic

Join for free to read