Case Study
Devon County Council
New cycleway construction over a 0.8km stretch adjacent to the existing railway as part of the Exe Estuary Trail in East Devon. The work included boardwalk sections, reinforced soil embankments, surfacing work, and construction of a 60m steel ramp and 21m span bridge on reinforced soil abutments with contractor design portions. Scope of the Works The work comprised the construction of 3m wide cycleway / footway over approximately 0.8k