Desiltation, Bank Reprofiling & Habitat Creation – Basingstoke Canal

Desiltation, Bank Reprofiling & Habitat Creation – Basingstoke Canal

Desiltation, Bank Reprofiling & Habitat Creation – Basingstoke Canal Client: Basingstoke Canal Trust Erosion Control Project – 2006-7 Project outline Extensive works have been carried out in the last 20 years to make the once disused Basingstoke Canal navigable. The canal is bordered by SSSIs on some stretches and these works had reduced the potential habitats for some rare species, particularly damsel and dragon flies. Stake installation I love my job! The aim of the project was to create lengths of marshy margins adjacent to a SSSI that would provide habitats for the species under threat. Services Provided 200m of bank were reprofiled by installing willow spilling between 1 and 2 metres from the existing bank. The space was to be filled with dredging from the canal to a depth just below