Case Study

Designing A Bleeding-Edge Leed®-Compliant Air Handling System

Designing A Bleeding-Edge Leed®-Compliant Air Handling System

Pages 5 Pages

DESIGNING A BLEEDING-EDGE LEED®-COMPLIANT AIR HANDLING SYSTEM The Total Solution for a 930-MW California Power Plant with Limited Space Allen Ray Director of Air & Gas Handling Group, ProcessBarron2 www.processbarron.com | 888.663.2028 SYNOPSIS ProcessBarron was contracted to help build a new facility called the GenOn Marsh Landing Generating Station — a brown? eld redevelopment at an existing power plant adjacent to the Contra Costa Power Pla

Join for free to read