SCOPE: Design, program and execute plan to section mill and remediate sustained casing pressure on the A-3 well. LOCATION: Grand Isle, Block 116 Gulf of Mexico, USA Operator had abandoned the lower section of the well in 2006. Sustained casing pressure existed on the 9 - 7/8” and 20” casings. Two plugs required section milling at different depths to properly remediate the pressure. Regulatory enforcement required the sustained casing pressure b