Case Study
Design of regional spare parts distribution center
Project Summary Miebach Consulting analyzed the supply chain network of a regional auto spares major, and suggested the company to move from a centralized network to a regional DC model. Miebach developed a comprehensive design which covered five storage system types to meet different product size, weight and velocity requirements. Due to several material flow and process changes global performance standards are met. Project Scope Design material flow and layout based on lean warehousing principles Define logistics processes leveraging the functionalities of SAP EWM Project management and assistance in 3PL selection Benefits 3 fold increase in workforce productivity Increased service level through delivery ex works in less than 4 hours Reduced picking errors to below 0,06% Design of region