Design, construction and commissioning of a temperature controlled Warehouse incorporating racking areas, cold rooms and administration support areas. The project was executed on a fast track basis with the facility up and running within an incredible 8 weeks. BES were involved from the scoping stage, developing the user requirement specification together with facility layouts and services designs. The facility is housed within an existing buildi