Case Study
Design and Construction of 7,755m2 Steel Fibre Reinforced Concrete (SFRC) ground bearing Internal Floor Slab for Japan Tobacco International
Design and Construction of 7,755m2 Steel Fibre Reinforced Concrete (SFRC) ground bearing Internal Floor Slab for Japan Tobacco International
Design and Construction of 7,755m 2 Steel Fibre Reinforced Concrete (SFRC) ground bearing internal floor slab for Japan T obacco International Japan T obacco International selected T wintec to build the first ever jointless SFRC floor slab constructed in Jordan at their new production facility in Amman. The sensitive production machinery being installed by JTI necessitated a very flat floor with minimal joints, which they were unable to obtain lo