Case Study
Demountable Flood Protection Systems CZ, Usti nad Labem (Elbe), Strekover Kai
Demountable Flood Protection Systems CZ, Usti nad Labem (Elbe), Strekover Kai Investor: Magistrat Usti nad Labem Authorising Body: Povodi Labe, statni podnik Operator: Magistrat Usti nad Labem Protection Level: HQ 20 + 0,20 m Freeboard Load Criteria: hydrostatic water pressure + 10 kN point load Flood height: 0,30 – 2,40 m Total Length/Area: 990 m/1850 m 2 Due to the low weight of the 2.40 m high freestanding alumi- nium posts (78 kg) all post