Case Study
Demolition of Fire Damaged Property
CASE STUDY: DEMOLITION OF FIRE DAMAGED PROPERTY Scope of Services: AET was contracted by a local government borough manager to provide environmental consulting and engineering services to demolish a three story (previously condemned) hotel partially damaged by fire. AET’s services included: 1. Hazardous Material Survey: EPA NESHAP regulations require an asbestos survey to be performed in a portion of the building remaining standing (structural