Case Study
Defect Reduction
www.enterpriseis.com.au CASE STUDY Defect Reduction CLIENT: Major Pipe Manufacturer LOCATION: NSW, Australia THE CHALLENGE: The client was Australia’s largest manufacturer of Oil and Gas pipe. The American Petroleum Institute (API) 5L standard for the manufacture of pipe to