Case Study

Decew Water Treatment Plant Spillway

Decew Water Treatment Plant Spillway

Pages 1 Pages

1 Kryton International Inc. 1645 East Kent Avenue, Vancouver BC, Canada V5P 2S8 | TEL 1.604.324.8280 | FAX 1.604.324.8899 | TOLL FREE 1.800.267.8280 | WEB kryton.com Kryton, Krystol and KIM are trademarks of Kryton International Inc. © 2018 CASE STUDY Decew Water T reatment Plant Spillway St. Catharines, ON, Canada (201 7) BACKGROUND After years of erosion, the Regional Municipality of Niagara decided it was time to replace the Decew Water Treatment Plant Spillway. The original reservoir spillway was constructed using wood, which had deteriorated significantly. The engineers planning the project wanted to replace wood with a more durable material. Even though they decided to build a concrete spillway, they wanted to ensure the concrete was durable and long-lasting. T o t

Join for free to read