Case Study

DB80 Concrete Barriers West Gate Tunnel Project - CPBJH Joint Venture, July 2018

DB80 Concrete Barriers West Gate Tunnel Project - CPBJH Joint Venture, July 2018

CASE STUDY: DB80 Concrete Barriers West Gate Tunnel Project CPBJH Joint Venture, July 2018 1800 809 809 fortressfencing.com.au SPECIALISED FENCING AND SAFETY EQUIPMENTSPECIALISED FENCING AND SAFETY EQUIPMENT Call Fortress Now. Consider it Done. 1800 809 809 fortressfencing.com.au THE PROJECT Victoria’s extensive West Gate Tunnel Project will deliver a vital alternative to the congested West Gate Bridge. It will provide a much needed second river crossing, quicker and safer journeys, and remove thousands of trucks from the city’s residential streets. This project is a partnership between the Victorian Government and Transurban and will be built by a joint venture between construction contractors CPB Contractors and John Holland (CPBJH JV). During construction, CPBJH