Case Study

Davyhulme

Davyhulme

Pages 2 Pages

Becton Becton, UK FACTSHEET Project and Plant data: • 91,000 metric tonnes DS/year • Doubling of capacity of existing 8x 7400m³ digester. • 4 x 5 reactor. • 10 MWe + THP steam. • Pasteurized product. • Reduced energy for drying and incineration. • Carbon emissions reduced by 32,000t CO2 equivalents/year • High performance digestion. • High dry solids final prod uct. • Maximized VS reduction. cambi.com BECTON Becton, UK BIO

Join for free to read